Laserfiche WebLink
WEST HAULROAD (HAULROAD A) - TR06-55 <br />~~~ RECLAMATION COST ESTIMATE <br />Facilities Demolition and Removal <br />Remove wck-scale equipment (crane and operator, tractor-trailer w/driver, and <br />laborers) - 2 days x $1,620/day $ 3,240 <br />Demolish wck-scale foundation and wash-down pit - (240 cy x $445/cy) 106.800 <br />Subtotal $110,040 <br />Backfilline and Regradine <br />Backfill wck-scale foundation and wash-down pit - 510 cy x $0.85/cy $ 440 <br />Remove gravel surfacing material from road - 840 cy x $1.20/cy 1,010 <br />Regrade/rip wck scale, haulroad, and clean-out ramp azeas - 2.5 acres x $1,200/ac 3.000 <br />Subtotal $ 4,450 <br />Tonsoil Relacement and Revegetation (only 500' of road is new conswction, for remainder reclamation <br />costs are included under existine bondl <br />Topsoil replacement 740 cy x $0.80/cy $ 600 <br />Revegetation - 0.5 acres x $285.64/ac 150 <br />Subtotal $ 750 <br />Subtotal -Direct Costs $115,240 <br />Indirect and Administrative Costs (8%1 9,220 <br />~ ~ Project Total Cost $124,460 <br />Notes: All figures rounded up to neazest $10 <br />Costs from Means Site Work and Landscape Cost Data and recent bond calculations <br />TRO6-5~h A _ ~Z ~ 05/03/06 <br />