My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-04_PERMIT FILE - C1982056A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2008-02-04_PERMIT FILE - C1982056A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:05 PM
Creation date
6/5/2008 2:25:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
2/4/2008
Section_Exhibit Name
Appendix A Bonding Calculations Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 RIGHT ACCESS ROAD TOPSOIL HANDLING REVISION <br />RECLAMATION COST ESTIMATE (TROS-50) <br />PREVIOUS COST FOR RE-TOPSOILING ACCESS ROAD (FROM WINDROWS) <br />T~soil Replacement <br />Topsoil replacement -3,950 cy x $0.80/cy ($ 3,160) <br />REVISED COST FOR TOPSOIL REPLACEMENT (FROM STOCKPILE) <br />Topsoil Reolacement <br />Topsoil replacement (using CAT 637GPP Tractor-Scraper @ 28 cy and $257/hr) <br />Haul I (from Topsoil Pile _ to west quarter of access road) <br />Volume 950 cy <br />Average haul distance - 950' <br />Average grade -+7% <br />Cycles - 34 <br />Cyc les/hr - 9 <br />Required hours - 3.8 <br />Direct Cost - $ 977 <br />Haul 2 (from Topsoil Pile L to west-center quarter of access road) <br />Volume I, l00 cy <br />Average haul distance - 950' <br />Average grade - - l <br />Cycles - 39 <br />Cycles/hr- IS <br />Required hours - 2.6 <br />Direct Cost - $ 669 <br />Haul 3 (from Topsoil Pile _ to east-center quarter of access road) <br />Volume 1,IOOcy <br />Average haul distance - 850' <br />Average grade - -8% <br />Cycles - 39 <br />Cycles/hr- 17 <br />Required hours - 2.3 <br />Direct Cost - $ 592 <br />Haul 4 (from Topsoil Pile _ to east quarter of access road) <br />Volume 800 cy <br />Average haul distance - 850' <br />Average grade - +2% <br />Cycles - 29 <br />Cycles/hr- 15 <br />Required hours - 1.9 <br />Direct Cost - $ 489 <br />TROS-50 ] ]4 09/26/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.