My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-04_PERMIT FILE - C1982056A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2008-02-04_PERMIT FILE - C1982056A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:05 PM
Creation date
6/5/2008 2:25:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
2/4/2008
Section_Exhibit Name
Appendix A Bonding Calculations Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6N MAINS UTILITY BOREHOLES <br />INCREMENTAL RECLAMATION COST ESTIMATE <br />(MROS-198) <br />Plue and Seal Boreholes <br />5 boreholes x 1,300' deep = 6,500' total borehole fcotage <br />5 @ 13" diameter x 1,300' deep = 6,000 ft' total borehole volume <br />6,000 ft' /3 ft'/sack x $9/sack = $18,000 (cement cost) <br />6,500 ft x 6hrs/1,000 ft x $230/hr = $8,970 (plug and seal costs for drill rig and labor) <br />Subtotal (plug and seal) $26,970 <br />Backfill Mud Pit and Reerade Pad Area <br />Backfill and regrade 0.92 acres - 3 hrs x $70/hr $ 210 <br />Topsoil and Reseed Area <br />Topsoil and reseed 0.92 acres - (6 hrs x $70/Iv) + (0.92 acres x $300/acre) $ 696 <br />Subtotal -Direct Costs <br />Indirect and Administrative Costs (8%1 <br />Project Total Cost <br />$ 27,876 <br />2 230 <br />$ 30,106 <br />MROS-198 III 09/01/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.