My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-04_PERMIT FILE - C1982056A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2008-02-04_PERMIT FILE - C1982056A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:05 PM
Creation date
6/5/2008 2:25:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
2/4/2008
Section_Exhibit Name
Appendix A Bonding Calculations Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 RIGHT BLEEDER SHAFT PROJECT- RECLAMATION COST ESTIMATE <br />(TR 04-44) <br />VENTILATION SHAFT AND ACCESS ROAD <br />Facilities Demolition and Removal <br />Remove fencing - 80 ft x $1.75/ft $ 140 <br />(perimeter of concrete shaft pad 24' x 15') <br />Demolish elevator surface structure - 10' x 10' x 10' x $0.26/cf 260 <br />(concrete block storage building for diesel generator and escape pod) <br />Demolish concrete pads - 760 cf x $3.50/sf 2,660 <br />(I S' x 24' shaft pad and 12' x 33' equipment pad, heavy reinforcing, 1' thick) <br />Demolish shaft collar (3' below grade) - 30 If x 3' x $13.30/sf 1,200 <br />(9' diameter to center of collar wall, I' thick wall) <br />Remove culverts - 249 If x $9.30/If (18" culvert) 2.3 I S <br />Subtotal $ 6,575 <br />Shaft Plueging and Sealing <br />Bottom Plug <br />FRP concrete (6' diameter x 15' thick, 8000 psi, pumped) - 16 cy x ($149.00 <br />+6.45+17.55)/cy + $147.03 2,915 <br />Backfilling - 1,000' x 28.3/27 x $0.57/cy 600 <br />Top Plug <br />FRP concrete (8' diameter x ] 0' thick, 8000 psi, pumped) - l9 cy x ($149.00 <br />+6.45+17.55)/cy + 147.03 3 435 <br />Subtotal $6,950 <br />Surfacine Material Removal and Reeradine <br />Remove surfacing material from shaft pad - (11 "/12 x 280' x 280')/27 x $1.47/cy $ 3,915 <br />Remove surfacing and base materials from road - (11"/12 x 24 x 4,400) <br />+ (23"/12 x 24 x 2,700)/27 x $1.47/cy 12,030 <br />Regmde pad area and road - (280' x 280') + (24' x 7,100')/43,560 x $1,200/ac 6.855 <br />Subtotal $22,800 <br />Topsoil Replacement and Reve etg anon <br />Topsoil replacement - 5,402cy x $0.80/cy $ 4,320 <br />(3,950cy -road, 1,452cy -pad) <br />Revegetation - 6.7 ac x $285.64/ac 1,915 <br />(1.8 acre -pad, 4.9 acres -road) <br />Subtotal 6 235 <br />Subtotal -Direct Costs $42,560 <br />Indirect and Administrative Costs (8%1 3,405 <br />Project Total Cost $45,965 <br />Notes: Dimensions from Map 1S-SQ, Exhibit 16C -Soils Investigations <br />Costs from Means Site Work and Landscape Cost Data <br />TR 04-44 107 8/25/04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.