Laserfiche WebLink
VOLUME II-B <br />LIST OF EXHIBITS <br />8 Sediment Control Plan <br />~~ 8A Proposed Dewatering Facility Culvert Sizing <br />8B EMD Vent Fan Site SAE <br />8C EMD Dewatering Facility SAE <br />8C1 EMD Treatment Pond Design <br />8D Escape Shaft/Light-Duty Road Culvert Design <br />8E Pond E Design <br />8E1 8 Right & 7 Right Cross-Panel Grout Operations Pad SAE <br />8E1(a) Corral SAE 10 yeaz/24 hour <br />SF CYCC Pond B -Stage Storage -Estimated <br />8G Sedimentation Pond C: Design and certification <br />8H Hydrologic Evaluation of sedimentation Ponds: A, and D and G <br />8H1 Montgomery Watson Evaluation of Pond D, 1999 <br />8H2 Pond D Modifications (TR07-59) <br />8I Sedimentation Pond F: Design and Certification <br />8J CYCC Pond G -Stage Storage <br />8K CYCC Fish Creek Borehole Pond -Stage Storage <br />• 8L Drill Pad SAE <br />8M Refuse Disposal Pile Bench Channel <br />8N SEDCAD for Diversions: PDl, PD2, PD3, PD4 <br />8P Plate 1, Titled, "Sediment Ponds, Energy Mines No. 1 and No. 2 and Eckman Pazk" <br />SQ Pond T Certification <br />8R Fish Creek Culvert Design, NW Mains Ventilation Shaft, and Fish Creek Borehole Culverts <br />8S Certification -Pond E, Fish Creek Tipple, SAE Demonstration NW Mains Ventilation Shaft <br />8T. 18-Right Ventilation Intake Shaft SAE <br />8U Scoria Storage Area and Storage and Training Area SAE/ABC's <br />8V Area 1 Pit Water Storage Basin hnpoundment Documentation <br />8 W Thickener Overflow Sump Impoundment Documentation <br />8X 6-Main North Intake Shaft Drainage Designs <br />8Y 18-Right Vent Shaft Access Road Topsoil Stockpile Diversion Ditches <br />8Z CYCC Office Building Drainage Design Documentation <br />8AA Haulroad A Drainage Designs <br />.8BB Washplant II Thickener Overflow Sump Impoundment Documentation (TR07-59) <br />TR07-59 vi <br />03/26/07 <br />