My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-19_PERMIT FILE - C1981047
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981047
>
2008-02-19_PERMIT FILE - C1981047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:59 PM
Creation date
6/5/2008 10:46:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Permit File
Doc Date
2/19/2008
Section_Exhibit Name
Reclamation Cost Estimate RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Permit Revision 05 <br />Task description : Backfiil and Regrade Ditch "F" <br />,., <br />..: <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series /l - 8SU (200; Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : 3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $58.24 NA <br /> Operating cosUhour : $73.75 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $164.77 Total fleet cost/hour : $164.77 <br /> <br />MATERIAL QUANTITIES ;> ; <br />Initial Swell Loose <br />volume : 94 CCY factor : 1.125 volume : 106 LCY <br /> <br />Source of estimated volume :Exhibit Z,' Appendix C <br />Source of estimated swell factor :CAT Handbook <br /> <br /> <br />HOURLY PRODUCTION <br />Job Condition Correction Factors ;. <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,400.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shiR/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : _ 1.00 ~ (Cat HB) <br />Average push gradient : _ _0.00_ % (pos) ___ Altitude : __ _ 1.00 __ _ ' _(C_at HB)_ <br />~ <br />Average site altitude : _ _ 6, 400 <br />feet ~ Material weight : 0.87 (Cat HB) <br /> _ Blade type : -- -1.00 - --- (S UN) <br />Material weight :_ 2,650 _Ibs/LCY i Net correction : 0.39 <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production : 544.41 LCY/hr <br /> Adjusted fleet production : 544.41 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 0.19 Hours <br />Unit cost : $0.303 /LCY Total job cost : $32 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.