My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-13_PERMIT FILE - C1992081A (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081A
>
2008-03-13_PERMIT FILE - C1992081A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:24:58 PM
Creation date
6/4/2008 5:29:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
3/13/2008
Doc Name
Railcar Loadout Operations Plan Reclamation Liability Estimate
Section_Exhibit Name
Tab 23 Attachment 23-2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHA4ENT 23-2 <br />COAL LOADOUT OPERATIONS PLAN RECLAMATION LIABILITY ESTIMATE <br /> <br />This section provides a reclamation cost estimate for the coal loadout <br />operations plan, which is the original operational plan for the Hayden Gulch <br />Loadout, and which is the existing and on-the-ground conditions for the <br />facility area. The only difference in the reclamation activities between the <br />coal loadout operational plan and the coal load-in operational plan is the <br />building configuration in the facilities area. Consequently, most direct <br />costs calculated by CDMG as part of the TR-06 liability estimate are <br />applicable. <br />The coal loadout operations reclamation cost estimate was calculated as <br />follows: <br />Direct Costs <br />• Backfilling and rough grading - CDMG costs, dated June, 2005 <br />• Ripping - CDMG costs, dated June, 2005 <br />• Road reclamation - CDMG costs, dated June, 2005 <br />• Finish grading - CDMG costs, dated June, 2005 <br />• Drainage control system removal - CDMG costs, dated June, 2005 <br />• Topsoil replacement - CDMG costs, dated June, 2005 <br />• Borehole sealing - CDMG costs, dated June, 2005 <br />• Building demolition - calculated by HGTI based on the list of <br /> buildings (and dimensions) presented in Table 12-1.2, and unit costs <br /> for Task 037 determined by CDMG in the TR-06 liability estimate. <br /> The temporary office building demolition costs calculated for MR-15 <br /> have been incorporated into this estimate. The miscellaneous costs <br /> identified by CDRMS in the 2007 Coal Bond Compliance Inspection (MR- <br /> 16) have been incorporated into this estimate. <br />• Miscellaneous reclamation - CDMG costs, dated June, 2005 <br />• Equipment mobilization/demobization - CDMG costs, dated June, 2005 <br />Indirect Costs <br />• Overhead and Profit - calculated by HGTI based on the coal loadout <br />operational plan direct costs using multipliers provided in Tab 23. <br />23-2.1 Revised 11/07 <br />MR-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.