Laserfiche WebLink
• <br /> <br /> <br />Project: Hayden Gulch Loadout <br />Permit: C-92-081 <br />Revision: MR-16, 2007Cost Bond Compliance Inspection <br />Date: 1116!2007 <br />By: jcw <br /> <br />Task: Reclamation Bonding Calculation <br /> <br />Item: Description Quantity Units Unit Cost Source Total Cost <br /> DIRECT COSTS <br />' <br />1 Remove fencing in Section 14 from State Land Board lands 3800 LF 0.4 Dillon Fencing <br />ician2 <br />El <br />t $1,520 <br />$260 <br />2 Disconnect electrical power supply to interior light poles 4 HR 65 ec <br />r <br />CDMG3 $200 <br />3 Remove interior light poles 2 HR 99.75 <br />4 Remove mine ID signs 8 HR 30 <br />ct <br />l Di <br />t <br />b $240 <br />220 <br />$2 <br /> re <br />a <br />Su <br />to , <br /> INDIRECT COSTS <br />4 Overhead and Profit <br /> Liability Insurance: % of direct 2.02 <br />05 <br />1 $45 <br />$23 <br /> Performance Bond: % of direct ' <br /> Job Superintendent NA <br />0 <br />0 NA <br />$222 <br /> Profit: % of direct 1 <br />. <br /> SubtotalO&P $290 <br /> Contract Amount (Direct + O&P) $2,510 <br /> <br />5 Legal-Engineering-Project Management <br />NA <br />NA <br /> Financial Warranty Processing <br /> Engineering Work and/or ContracUBid Preparation NA <br />5 NA <br />$111 <br /> Reclamation Management: % of contract amount direct <br />l i <br />bt <br />t $401 <br /> n <br />a <br />o <br />Su <br /> Total Bond Amount (Direct+ Indirect) $2,621 <br /> r <br /> ber <br />t <br />i <br />S 2007 <br />Notes: , <br />em <br />ep <br />on, <br />1) per quote from Dillon Fencing & Contracting, a fencing contractor used by HGTI, personal communicat <br /> 2) per Dave Winograski (certified MSHA electrician), personal communication, September, 2007 <br /> 3) Cat 325C Loader, CIRCES, 2005 <br />MR-16 <br />Revised 11/07 <br />