My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-13_PERMIT FILE - C1992081A (6)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081A
>
2008-03-13_PERMIT FILE - C1992081A (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:24:58 PM
Creation date
6/4/2008 5:24:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
3/13/2008
Section_Exhibit Name
Tab 13 Hydrologic Monitoring Program
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Groundwater Monitoring. Groundwater monitoring at wells HGDALI, HGDAL2 and HGDAL3 <br />were conducted semiannually during the high and low flow periods, as specified for <br />surface water, through November 1995. As described in the revisions presented in <br />TR-O1, after four sampling and analytical events were completed for site HGDAL3, <br />than the monitoring at walls HGDALI and HGDAL2 was discontinued (as noted above, <br />HGTI abandoned monitor walla HGDALl and HGDAL2 during 2005). Since November 1995, <br />only well HGDAL3 has been monitored as part of the groundwater monitoring program. <br />HGTZ added monitor well HGDRL4 to the monitoring program during 2005 as part of TR- <br />06. Those wells are monitored semiannually for water levels, field water quality <br />parameters (pH, temperature, and conductivity) and the parameter suite presented in <br />Table 13-2, Groundwater Parameter List. The groundwater parameter list has also <br />been revised. Monitoring for barium, molybdenum, phosphate, ammonia and silver <br />will be discontinued. These parameters are not listed in the groundwater <br />agricultural standards eet forth by the CDPHE in Regulation dl, Basic Standards for <br />Groundwater. Sample analyses will be performed by a contract laboratory certified <br />by the State of Colorado. <br />Colorado Wastewater Discharge Permit System (COPS) Monitoring. The COPS permit for <br />the Hayden Gulch Loadout facility (COG-850008), was transferred from HGCC to HGTI <br />on November 6, 1992. HGTI successfully renewed the CDP9 permit in 1997, with an <br />effective date of July 1, 1997. HGTI recently renewed the permit, with a renewal <br />date effective oP July 1, 2002. A copy of the COPS permit is presented in Appendix <br />13-1. The required CbPS monitoring at Outfalls 001 (Truck Loop Pond) and 002 (Rail <br />Loop Pond) lsee Exhibit 12-2) will be performed in accordance with the terms and <br />conditions contained in COPS Permit No. COG-850006 (see Appendix 13-1). <br />l <br />~.. <br />TR-06 10 Revised 06/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.