My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-14_PERMIT FILE - C1981028A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981028A
>
2008-04-14_PERMIT FILE - C1981028A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:27:32 PM
Creation date
6/4/2008 4:28:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028A
IBM Index Class Name
Permit File
Doc Date
4/14/2008
Section_Exhibit Name
Table of Contents
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VOLUME III <br />APPENDICIES (continued <br />Appendix Description <br />N-1 ) <br />N-2 )Site Plan (drawings) <br />N-3 ) <br />N-4 Site Development (drawing) <br />N-5 Topsoil Piles -Location Map (archived) <br />N-6 ) <br />N-7 )Service Road (main access paved road) Plan, Profile & Section <br />N_g ) (drawings) <br />N-9 Main Access Road (drawing) <br />N-10 Access (Haul) Road Profile (drawing) <br />N-l0a Typical Existing Light-Duty Access Road Cross Section (drawing) <br />O-1 Office and Shop Building -Floor Plans (drawing) <br />O-2 Office and Shop Building -Exterior Elevations (drawing) <br />O-3 Sewage Disposal System -Sections & Details (drawing KM-4-17) <br />A-1 Service Facility Addition -Site Plan (drawing) <br />A-2 Service Facility Addition -Exterior Elevation (drawing) <br />P-1 Electrical 13.2 KV Distribution System (drawing, KM-4-950, 1 of 5) <br />P-2 Electrical 13.2 KV Distribution System (drawing, KM-4-950, 3 of 5) <br />P-3 Letter of Understanding -Electric Service (05/28/93) <br />Q-1 Reclamation Contour & Drainage Plan Map -final <br />Q-1(a) Topographic Map -Original Drainage Directions & Slopes <br />Q-3 Pre Mining Contours - 1st 5-year Permit Area (map) <br />R-1 TR #31 -Coal Supply Change (09/95) <br />R-2 MR #28 -Coal Supply Testing (09/96) <br />R-3 MR #32 -Coal Testing & Temporary Coal Supply (03/98) <br />R-4 MR #34 -Mine Waste Rock Addition (08/98) <br />R-5 MR #38 -Additions to the Reclamation Plan (OS/O1) <br />R-6 TR #34 -Modification of Final Contour Across Long Term Spoil (01/03) <br />R-7 TR #35 -Change of Coal Supply/Source of Ash (12/03) <br />R-8 TR #36 -Change Approved Post-Mining Land Use -Partial (1) <br />R-9 TR #38 -Change Approved Post-Mining Land Use -Partial (2) <br />R-10 TR #39 -Change Approved Post-Mining Land Use -Partial (3) <br />OS <br />
The URL can be used to link to this page
Your browser does not support the video tag.