My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-05_PERMIT FILE - C1980001A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980001
>
2008-05-05_PERMIT FILE - C1980001A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:29:08 PM
Creation date
6/4/2008 4:24:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001A
IBM Index Class Name
Permit File
Doc Date
5/5/2008
Section_Exhibit Name
4.6 Hydrologic Balance Control Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• the mining years was performed. For the south ditch, Year 1 contained the <br />highest peak flows while Year 20 contained the highest peak flow in the <br />northern ditch. Table 9.6-11 shows the design calculation summaries for both <br />the south and north ditch. The computer generated results and watershed <br />dissection for the south ditch are provided in Appendix 9.6-D The computer <br />results for the north ditch are provided in Appendix 4.6-8 (Final Year 10-yr, <br />24-hour storm) while the watershed dissection is shown in Exhibit 9.6-2. <br />Ditch profiles and cross sections are shown in Exhibit 9.6-5. The inlet on <br />the south side of the pond was designed using the SEDCAD+ computer model. The <br />results of the modeling effort are provided on page 9.6-33a and a graphical <br />representation of the results is provided on page 4.6-33b. <br />9.6.1.6 Sediment Pond and Diversion Ditch Construction <br />The sediment pond and diversion ditches will be built using scrapers, <br />dozer, or other excavating machines. The primary spillway of the pond will be <br />placed with the aid of a backhoe. The emergency spillway will be built to <br />design specifications utilizing a dozer or other suitable equipment to <br />-~ construct the channel. Prior to constructing the embankment, the foundation <br />area will be cleared of all organic matter and the surface scarified. The <br />fill material to be used will be free of sod, large roots, other large <br />vegetation matter and frozen soil. Placing and spreading of the fill material <br />will be started at the lowest point of the foundation with *_he fill being <br />brought up in horizontal layers with a maximum thickness of two feet to <br />facilitate compaction. <br />A small area of disturbance around the pond will occur during <br />construction. The design of the pond (lowest surface disturbance area to pond <br />volume possible) and careful supervision during construction will keep this <br />disturbance to a minimum. All areas of disturbance due to construction <br />requirements will be appropriately seeded and mulched following construction. <br />4.6.1.7 Sediment Control for Small Area Exemptions <br />Exhibits 9.3-1 (areas) which will not have topsoil removed, 4.6-17, 9.6- <br />21 and 4.6-23 show the locations of all the small area exemptions at Edna <br />• 4.6-33 May 19, 1993 <br />
The URL can be used to link to this page
Your browser does not support the video tag.