Laserfiche WebLink
• highest peak flow (cfs), the peak stage in the pond was only 9.7 feet. Year <br />20 was determined to have the highest peak stage with the water level in the <br />pond at 11.29 ft. It was from this evaluation that sizing the for pond <br />storage capacity was developed. Table 4.6-6 shows the subwatershed time of <br />concentration and hydrograph routing parameters for each subwatershed. Table <br />9.6-7 shows the parameters for routing the subwatershed hydrographs between <br />junctions and/or structures. Exhibit 4.6-2 indicates the watershed dissection <br />used for the peak stage calculations and Appendix 4.6-8 contains the computer <br />model results. <br /> <br /> <br />4.6-16 <br />November 1,1989 <br />