Laserfiche WebLink
~" TABLE OF CONTENTS - CONTINUED <br /> PAGE <br />2.04.6 Geology Description 2.04-6 <br />2.04.7 Hydrology Description 2.04-7 <br /> Groundwater Information 2.04-7 <br /> Surface Water Information 2.04-16 <br /> Alternative Water Supply Information 2.04-25 <br />2.04.8 Climatological Information 2.04-26 <br />2.04.9 Soils Resource Information 2.04-29 <br />2.04.10 Vegetation Information 2.04-30(a) <br />2.04.11 Fish and Wildlife Resources Information 2.04-31 <br />2,04.12 Prime Farmland Investigation 2.04-34 <br />RULE 2.05 <br />2.05.1 Objectives 2.05-1 <br />2.05.2 Operation Plan - Life of Operation 2.05-1 <br />Production Methods and Equipment 2.05-1 <br />Operation Description 2.05-4 <br />2.05.3 Operation Plan - Permit Area 2.05-5 <br />Production Methods and Equipment 2.05-5 <br />Operation Description 2.05-6 <br />Mine Facilities 2.05-7 <br />Ponds, Impoundments and Diversions 2.05-9 <br />Culvert Cleaning 2.05-16 <br />Topsoil 2.05-17 <br />Overburden 2.05-17 <br />Coal Handling Structures 2.05-18 <br />Coal Processing Waste & Non-Coal Processing <br />Waste 2.05-18 <br />Underground Development Waste 2.05-19_ <br />. <br />Return of Coal Processing Waste to Abandoned __ <br />Workings 2.05-19 <br />2.05.4 Reclamation Plan 2.05-20 <br />Timetable _2.05-20 <br />Reclamation Cost Estimate 2.05-21 <br />Backfill and Grading 2.05-22 <br />Topsoil Removal, Storage and Redistribution 2.05-22 <br />Revegetation 2.05-24 <br />Sealing and Managing Mine Openings 2.05-27 <br />2.05.5 Post - Mining Land Uses 2.05-29 <br />2.05.6 Mitigation of Surface Coal Mining Operation <br />Impacts 2.05-31 <br />Air Pollution Control Plan 2.05-31 <br />Fish and Wildlife Plan 2.05-31 <br />Protection of Hydrologic Balance 2.05-34 <br />^~ Buffer Zone 2.05-37 <br />Water Rights 2.05-38 <br />RE,V~SEO ~~~s~9 r <br />