Laserfiche WebLink
~~l~l'Ci ~ ~L~Yt~1i ~,>C]rl~'C># <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT- FIELD DENSITYTESTS <br />Date: Thursday, NovM/07 Arrive Tima: 8:00 AM <br />Depart Time: 4:45 Pf~1 <br />Project Name: Westenl FuePs Ponds <br />(#1 ?and #13) weather: Clear <br />Project Number: Mo7ii7MT Temp: Copt <br />Client: Williams Gansfruvtion Client Representative: <br />General Contractor. Supervisor: Patrick McKeever <br />Specialty Contractor: Specialty Superintendent or Foreman: <br />Source of Fiil Material: bn sifo Plans and Specs: <br />Prepared by: DaGsd: <br />Contractor's Equipme»t Ussd: Trackhae, dozer blade, dump trucks and sheepsfaot railer <br />Lambert and Associates Equipment Used • Manufactursc CPN Serial Number or Unit Number I6 <br />Test Results were Verbally Given On-Site to: Patrick McKeever & Ross Gubka <br />Expected Conditions Observed; Yss <br />Unexpected Conditions Observed: Nona <br />Unusual Conditions Obsorved: No <br />!f yes, who was contacted? <br />Follow-up from Prlor Visit: Retests Performed: <br />Concerns €or Noxt Visit: Retests Needed: <br />Other personnel contacted on•site: nametfrrm Ross Gubka - Western Fuets'Chief Engineer <br />Notes: <br />Please refer to the test results sheets for appraximafe test #ocations and test rasatts. Fhe fell results ind#cate on#y, the <br />re#ative eampavtinn and salt rnoisture vrnlent of the nlafrria# tested at the a#evatian And /ovation tested at the time of <br />our site visit. # picked up a Praclor mater#al from pond #i3, perAtan and Rass G, conversation. /transported It)e <br />sample to our#aboratory for further testing, #f we are #n area, please contact Ross Gubka, he would #ike to have the <br />tap Erna! tasted. He does oat want g seperato trip fir testing however. <br />lambert and Associates Technician: Sanborn <br /> <br />Attachment 2.05.3(3)-20-46 <br />