Laserfiche WebLink
Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Partial Phase I Bond Release SL-03 <br />Task description :Replace Topsoil from Stockpile to Replaced Fill <br /> <br />HOURLY ~E::::UI PMENT:C';;:;:: .... <br />Q OST .......................................................................................................................... ................................ ............................ <br /> Basic machine :Cat D10R - 10SU (2005) Horsepower : 570 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $97.38 NA <br /> Operating cost/hour : $138.49 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $268.65 Total fleet cost/hour : $1,074.59 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 11,200 CCY factor : 1.115 volume : 12,488 LCY <br /> <br />Source of estimated volume :Map - OVWM Topsoil Replacement <br />Source of estimated swell factor :CAT Handbook <br /> <br />HOURLY PRODUCTION:<::;.:........_.. ...... ..................._........._...............................,.....::.___....._ .._...._............ <br />Job Condition Correction Factors .....................,.,....... ..:... _..._......... <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 300 feet Material consistency :_ 1.00 (Cat HB) <br />Unadjusted hourly production : 633.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 0.79 (Cat HB) <br />Average push gradient : 10.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,100 feet Material weight : 1.10 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,100 Ibs/LCY Net correction : 0.43 <br />Weight description <br />Earth -Loam Adjusted unit production : 271.67 LCY/hr <br /> Adjusted fleet production : 1,086.68 LCY/hr <br /> <br />JOB~TIME AND COST ::::::................ .......................................................................................................................... ................................ .. <br />......................... <br />Fleet size : 4 Dozers) Total job time : 11.49 Hours <br />Unit cost : $0.989 /LCY Total job cost : $12,349 <br />