Laserfiche WebLink
Utilization <br />Cost Breakdown : Ownership cost/hour : $97.38 NA <br />Operating cost/hour : $138.49 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $268.65 Total fleet cost/hour : $1,074.59 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 20,700 CCY factor : 1.115 volume : 23,080 LCY <br /> <br />Source of estimated volume :Map - OVWM Topsoil Replacement <br />Source of estimated swell factor :CAT Handbook <br /> <br />HOURLY PRODUCTION ~ ~ ~ Job Condition Correction Factors ~ ~ ~ Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 250 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 754.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 0.54 (Cat HB) <br />Average push gradient : 20.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,200 feet Material weight : 1.10 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,100 Ibs/LCY Net correction : 0.30 <br />Weight description <br />Ea-th -Loam Adjusted unit production : 224.06 LCY/hr <br /> Adjusted fleet production : 896.22 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 4 Dozers) Total job time : 25.75 Hours <br />Unit cost : $1.199 /LCY Total job cost : $27,674 <br />