My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-02_PERMIT FILE - C1981038
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2008-04-02_PERMIT FILE - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:26:44 PM
Creation date
6/4/2008 10:49:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
4/2/2008
Section_Exhibit Name
Reclamation Cost Estimate RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Partial Phase 1 Bond Release SL-03 <br />Task description :Push Fill from Outs/ope Zone 2-B to Portal Zone 4-C <br />HOURLY EQUIPMENT COST <br />volume : 87 CCY <br />factor : 1.165 volume : 101 LCY <br />Source of estimated volume :Map 5C-6A and 8A-2 <br />Source of estimated swell factor :CAT Handbook <br />......................................, ..........................................................,................. :..........................,:::,.Source ::.:: <br />HOURLY PRODUCTION Job Condition Correction Factors <br />Average push distance : 175 feet <br />Unadjusted hourly production : 1,074.3 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 15.00 % (I <br />Average site altitude : 7,160 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth <br />Operator skill : 0.75 (avg.) <br />Material consistency : 0.90 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (1shift/day) <br />Spoil pile : 0.80 (fnd-rf) <br />Push gradient : 0.67 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.79 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.24 <br /> <br />Adjusted unit production : 254.49 LCY/hr <br />Adjusted fleet production : 1,017.95 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 4 Dozers) Total job time : 0.10 Hours <br />Unit cost : $1.056 /LCY Total job cost : $107 <br />Basic machine : Cat D10R - 10SU (2005) Horsepower : 570 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br />
The URL can be used to link to this page
Your browser does not support the video tag.