My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-02_PERMIT FILE - C1981038
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2008-04-02_PERMIT FILE - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:26:44 PM
Creation date
6/4/2008 10:49:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
4/2/2008
Section_Exhibit Name
Reclamation Cost Estimate RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Partial Phase I Bond Release SL-03 <br />Task description : Backfill and Regrade Pond 1 <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : Ownership costlhour <br />Operating cost/hour <br />Ripper op. cost/hour <br />Operator cosUhour <br />Total unit cost/hour <br />MATERIAL QUANTITIES <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br />Utilization <br />$71.49 NA <br />$103.27 100 <br />$0.00 0 <br />$32.78 NA <br />$207.53 Total fleet cost/hour : $207.53 <br />Initial Swell Loose <br />volume : 1,129 BCY factor : 1.330 volume : 1,502 LCY <br /> <br />Source of estimated volume :Permit Volume 1, Page 33; Map 8-1 <br />Source of estimated swell factor :CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source ~~ <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,243.2 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-r1) <br /> Push gradient : 1.11 (Cat HB) <br />Average push gradient : 5.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,000 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.40 <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 492.74 LCY/hr <br /> Adjusted fleet production : 492.74 LCY/hr <br /> <br /> <br />................................... <br />JOB TIME AND COST :::::::.................................... <br />..................................... <br />..................................... <br />.............................. . <br />.................................................................. ......................... ................................. <br />Fleet size : 1 Dozers) Total job time : 3.05 Hours <br />Unit cost : $0.421 /LCY Total job cost : $632 <br />
The URL can be used to link to this page
Your browser does not support the video tag.