Reclamation Cost Estimate RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Partial Phase 1 Bond Release SL-03 <br />Task description : Backfill OVM Pipeline Removal Trench <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D10R - 10SU (2005) Horsepower : 570 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $97.38 NA <br /> Operating cost/hour : $138.49 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $268.65 Total fleet cost/hour : $1,074.59 <br />MATERIAL:::::UANTITI ES ::::::.......... <br />Q ......................................................... ................................................................. ................................ ............................ <br />Initial Swell Loose <br />volume : 3,611 C CY factor : 1.165 volume : 4,207 LCY <br /> <br />Source of estimate d volume :1988 Cypnrs Estimate <br />Source of estimated swell factor :CAT Handbook <br /> <br />HOURLY PRODUCTION ~ ~~ ~ ~ ~ Job Condition Correction Factors ~ Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 2, 748.7 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rt) <br /> Push gradient : 1.11 (Cat HB) <br />Average push gradient : 5.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,300 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.40 <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 1089.44 LCY/hr <br /> Adjusted fleet production : 4,357.77 LCY/hr <br /> <br /> <br />................. <br />JOB TIME AND COST ::::::................. <br />......................................................... <br />......................................................... <br />................................................................ <br />................................................................. <br />................................ <br />............................... <br />...................... . <br />............................ <br />Fleet size : 4 Dozers) Total job time : 0.97 Hours <br />Unit cost : $0.247 /LCY Total job cost : $1,037 <br /> <br />