Laserfiche WebLink
Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Partial Phase 1 Bond Release SL-03 <br />Task description : Fin-sh Grade OVM <br />HOURLY EQUIPMENT COST <br />Basic machine :CAT 14H <br />Attachment no. 1 :NA <br />Attachment no. 2 :Multi-shank ripper <br />Cost Breakdown Ownership cost/hour <br />Grader operating cost/hour <br />Ripper operating cost/hour <br />Operator cost/hour <br />Total unit cost/hour <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 2.73 <br />Horsepower: 215 <br />Shift basis : 1 per day <br /> <br /> <br />$43.20 Data source : (CRG) <br />Utilization <br />NA <br />$48.51 100 <br />$0.00 0 <br />$24.47 NA <br />$116.18 Total fleet cost/hour : $116.18 <br />acres <br />Source of estimated acreage :Map 8-1; Acreage Reduced via Phase I Bond Release <br />......................................................................................................................................................................................:.:.......::..:.. <br />....... <br />HOURLY PRODUCTION ::::::............................................................................................................................................................................... <br />............................... <br />Selected application :Finish grading (0-2.5 mph) <br />Average grader speed : 1.25 mph <br />Selected blade angle : 30 degrees " • at o degrees, blade is perpendicular <br />Effective blade length : 12.10 feet to direction of travel. <br />Width of blade overlap per pass : 2.00 feet <br />Net grading or ripping width per pass : 10.10 feet "" "width of ripper beam on ripping applications <br />Unadjusted hourly unit production : 1.5303 acres/hour <br />Job Condition Correction Factors Source <br />Average site altitude : 7,000 feet Altitude adjustment factor : 1.00 (Cat HB) <br /> Job efficiency adjustment factor : 0.85 (1sh/d, mod.) <br /> Net job correction : 0.8500 multiplier <br /> <br />Adjusted hourly unit production : 1.3008 acres/hour <br />Adjusted hourly fleet production : 1.3008 acres/hour <br />......................................................................................:......... <br />JOB TIME AND COST ..:.:::.::.:::::::.::::: ::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::: <br /> : <br />Fleet size : 1 grader(s) Total job time : 2.10 hours <br />Unit cost : $89.32 per acre Total job cost : $244 <br /> <br />