Laserfiche WebLink
Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Partial Phase 1 Bond Release SL-03 <br />Task description : Regrade TR-38 Light-Use Road <br />HOURLY~E::::UIPMENT COST :::::::....................................................................................................................................................................... <br />............... <br />Basic machine : Cat D10R - 10SU (2005) Horsepower : 570 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $97.38 NA <br />Operating cost/hour : $138.49 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cosUhour : $268.65 Total fleet cost/hour : $1,074.59 <br /> <br />................................................................ <br />MATERIAL::::::::ANTITIE ::::::................................................................ <br />QU S <br />............................... <br />............................... <br />................................................................................................... <br />.................................................................................................... <br />Initial Swell Loose <br />volume : 2, 730 CCY factor : 1.165 volume : 3,180 LCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 200 feet <br />Unadjusted hourly production : 946.0 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 5.00 % (1 <br />Average site altitude : 7,850 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Decomposed rock - 50% Rock, 50% Ea-th <br />JOB TIME AND COST <br />Fleet size : 4 Dozers) <br />Unit cost : $0.884 /LCY <br />Condition Correction Factors Source <br />Operator skill : 0.75 (avg.) <br />Material consistency : 0.90 (Cat HB) <br />_ <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (1shiff/day <br />Spoil pile : 0.80 (fnd-rf) <br />Push gradient : 0.90 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.79 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.32 <br /> <br />Adjusted unit production : 303.73 LCY/hr <br />Adjusted fleet production : 1,214.92 LCY/hr <br /> <br />Total job time : 2.62 Hours <br />Total job cost : $2,813 <br />