Laserfiche WebLink
Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Partial Phase I Bond Release SL-03 <br />Task description :Rip Outslope of Haul Road <br />HOURLY EQUIPMENT COST <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic <br />Area <br />Basic machine : Cat D10R - 10SU (2005) Horsepower : 570 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br />NA NA <br />3.38 acres <br />Selected estimating method : Area <br />Load factor : NA Bank volume <br />Rip depth (ft) : 0.60 Volume <br />NA <br />3,272 <br />BCY <br />BCY or CCY <br />Source of estimated quantity :Map 5C-6A and 8A-2 <br />Source of estimated load factor :NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity : NA feet/second <br />Unadjusted production : NA cu. yds./hour <br />Unadjusted production <br />per selected method : 4,399.05 cu. yds./hour <br />Area : Avg. ripping depth : 2.88 feet/pass Site altitude : 7,100 feet <br />Average ripping width : 8.67 feet/pass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 200.00 feet/pass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feet/minute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.947 acres/hour Adjusted unit production : 3,651.21 cu. yds./hour <br />Unadjusted production : 4,399.05 cu. yds./hour Adjusted fleet production : 14,604.84 cu. yds./hour <br /> <br />JOB TIME AND COST:.;:.;:;.; .................. ...................... .................................... ................................................................. .......................... <br />...... ................................. <br />Fleet size : 4 dozers) Total job time : 0.22 hours <br />Unit cost : $0.059 per cu. yd. Total job cost : $193 <br /> <br />