Laserfiche WebLink
Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Partial Phase I Bond Release SL-03 <br />Task description :Regrade Old Waste Disposal Road <br />HOURLY EQUIPMENT COST <br />Machine description :Cat 330C L <br />Horsepower: 244 <br />Weight (MT) : 33.72 <br />Cost Breakdown : Utilization <br />Ownership cost/hour : $45.61 NA Shift basis : 1 perday <br />Operating cost/hour : $61.06 100 Data source : (CRG) <br />Operator cosUhour : $32.96 NA <br />Total unit cost/hour : $139.63 Total fleet cost/hour : $139.63 <br /> <br />............................... <br />MATERIAL::::.UANTITIES :::::::................................ <br />Q <br />................................... <br />.................................. <br />...................................... <br />....................................... <br />................................................................................................... <br />.................................................................................................. <br />Initial Swell Loose <br />volume : 1,866 BCY <br />factor : 1.330 volume : 2,482 LCY <br />Source of estimated volume :Map 8-1 <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION :::::::.............................................................................................................................................................................. <br />............................... <br />Excavator Cvcle Time (load bucket, swing loaded, duma bucket, swino emot <br /> Basic job condition description : AVERAGE <br /> Secondary job condition within basic description : AVERAGE <br /> Cycle time value : 0.32 minutes <br />Bucket Capacity <br />Rated bucket capacity : 2.25 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 90%) <br />Adjusted bucket capacity : 1.91 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 7,000 feet Altitude adjustment : 1.00 (Cat HB) <br /> Job efficiency adjustment : 0.83 (1 shift/day) <br /> Net job correction : 0.83 multiplier <br /> <br />Unadjusted hourly unit production : 357.48 LCY/hour <br />Adjusted hourly unit production : 296.71 LCY/hour <br />Adjusted hourly fleet production : 296.71 LCY/hour <br />JOB TIME AND COST ::::::................. ............................................................. .............................................................. ................................ <br />... ................................... <br />Fleet size : 1 excavator(s) Total job time : 8.36 hours <br />Unit cost : $0.471 per LCY Total job cost : $1,168 <br /> <br />