My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-02_PERMIT FILE - C1981038
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2008-04-02_PERMIT FILE - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:26:44 PM
Creation date
6/4/2008 10:49:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
4/2/2008
Section_Exhibit Name
Reclamation Cost Estimate RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COMPACTION WORK <br />PROJECT IDENTIFICATION ::::::.......................................................................................................................................................................... <br />................... <br />Task # : 032 State :Colorado Permit/job # : C-1981-038 <br />Date : 20-Nov-2007 <br />User : JRS <br />Abbreviation :none <br />Filename : C038-032 <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Partial Phase 1 Bond Release SL-03 <br />Task description :Compact Waste Pile <br />HOURLY EQUIPMENT COST <br />County :Delta <br />Site :Bowie No. 1 Mine <br />Machine description :CAT 815E <br />Compactor type :Soil -tamping foot <br />Horsepower: 240 <br />Shift basis : 1 per day <br />Source of estimated volume : Permit Volume 6A -Reclaimed Disposal Area <br />Source of estimated shrinkage factor :CAT Handbook <br />::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::.:::.::.:.:::..:..................................................................................................................... <br />......................................................... <br />HOURLY PRODUCTION <br />Unadiusted hourly production = (W x S x L x Cl / P <br />Compacted width per pass (W) : 6.42 feet <br />Average compactor speed (S) : 4.00 mph <br />Compacted thickness of each lift (L) : 8.00 inches <br />Conversion constant (C) : 16.3 (5,280 ft./12 in./27 cu.ft.) <br />Required number of machine passes (P) : 4 passes <br />Unadjusted hourly unit production : 837.17 CCY/hr <br />Job Condition Correction Factors Source <br />Site altitude : 6,800 feet Altitude adjustment factor : 1.00 (Cat HB) <br /> Job efficiency factor : 0.83 (1 shift/day) <br /> Net job correction : 0.83 multiplier <br /> <br /> Adjusted hourly unit production : 694.85 CCY/hr <br /> Adjusted hourly fleet production : 694.85 CCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 compactor(s) Total job time : 92.54 hours <br />Unit cost $0.192 per CCY Total job cost : $12,341 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.