Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Task # : 027 State :Colorado Permit/job # : C-1981-038 <br />Date : 11/20/2007 County :Delta Abbreviation :none <br />User : JRS Site :Bowie No. 1 Mine Filename : C038-027 <br />Permit or other job action :Partial Phase 1 Bond Release SL-03 <br />Task description :Haul Footprints of Coal and Mine Stockpiles to Refuse Area <br />HOURLY EQUIPMENT COST :::::...........................................................................:.:::::Shift basis.:.:::::::::.1 per day::.::............................. <br />Description <br />Truck/loader team -Truck :Cat 773D (2002) <br />-Loader :CAT 990 Series 11(2005) <br />Support equipment -Load area :Cat D10R - 10SU (2005) <br />-Dump area :Cat D10R - 10SU (2005) <br />Road maintenance -Motor grader :CAT 14H <br />-Water truck :Water Tanker. 5.000 Gal. <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer grader misctruk <br />Utilization-machine : 100 82 100 100 50 50 <br />-Ripper attachment : NA NA 0 0 0 NA <br />Ownership cost/hour : $52.49 $105.80 $84.86 $84.86 $39.60 $21.89 <br />Operating cost/hour : $88.21 $96.30 $138.49 $138.49 $24.26 $17.36 <br />Ripper op. cosUhour : NA NA $0.00 $0.00 $0.00 $0.00 <br />Operator cosUhour : $21.72 $32.96 $32.78 $32.78 $24.47 $33.94 <br />Unit subtotals : $162.42 $235.06 $256.13 $256.13 $88.32 $73.19 <br />Number of units : 2 1 1 1 1 1 <br />Group subtotals : Work : $559.90 Support : $512.26 Maintenance : $161.52 <br />Total work team cost/hour : $1,233.67 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 3,327 CCY factor : 1.185 volume : 3,942 LCY <br />Material weight : 1,600 pounds/LCY Struck volume <br />Descr.: Coa! -Bituminous, Raw Heaped volume <br />Rated payload <br />Payload capacity <br />108,060 pounds Average volume <br />67.54 LCY Adjusted volume': <br />Final truck volume based on number of loader passes <br />'truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Caaacity : Job Condition Correctiol <br />Rated capacity (nom. heaped) : 11.250 LCY Truck <br />Descr.: Loose material - 1/8" to 3/8" (90 - 95%) Altitude adj.: 1.000 <br />Bucket fill factor : 0.925 Job efficiency : 0.830 <br />Adjusted bucket capacity : 10.406 LCY Net correction : 0.830 <br />33.80 LCY <br />45.90 LCY <br />39.85 LCY <br />45.90 LCY <br />41.62 LCY <br />Site altitude (ft.) : 7,100 <br />Loader Source <br />1.000 (Cat HB <br />0.830 (1 shift/da <br />0.830 <br />