My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-02_PERMIT FILE - C1981038
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2008-04-02_PERMIT FILE - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:26:44 PM
Creation date
6/4/2008 10:49:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
4/2/2008
Section_Exhibit Name
Reclamation Cost Estimate RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
>.. .,. <br />PROJECT IDENTIFICATION <br />Agency or organ <br />Task # : 026 <br />Date : 11/20/2007 <br />User : JRS <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />ization name :Colorado Division Of Reclamation, Mining And Safety <br />State :Colorado Permit/job # : C-1981-038 <br />_ County :Delta Abbreviation :none <br />Site :Bowie No. 1 Mine Filename : C038-026 <br />sheet 1 of 2 <br />Permit or other job action :Partial Phase I Bond Release SL-03 <br />Task description :Remove Temporary Waste Pile to Waste Disposal Area <br />HOURLY EQUIPMENT COST :::::............................................................................::::::Shift basis.:.:::::;::::1 per day:•;:.;:..... <br />~Eouioment Descriotion <br />Truck/loader team -Truck :Cat 773D (2002) <br />-Loader :CAT 990 Series 11(2005) <br />Support equipment -Load area : Cat D10R - IOSU (2005) <br />-Dump area : Cat D10R - IOSU (2005) <br />Road maintenance -Motor grader :CAT 14H <br />-Water truck <br />Tanker, 5, 000 Gal. <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer grader misctruk <br />Utilization-machine : 100 86 100 100 50 50 <br />-Ripper attachment : NA NA 0 0 0 NA <br />Ownership cost/hour : $52.49 $105.80 $84.86 $84.86 $39.60 $21.89 <br />Operating cost/hour : $88.21 $100.75 $138.49 $138.49 $24.26 $17.36 <br />Ripper op. cosUhour : NA NA $0.00 $0.00 $0.00 $0.00 <br />Operator cost/hour : $21.72 $32.96 $32.78 $32.78 $24.47 $33.94 <br />Unit subtotals : $162.42 $239.51 $256.13 $256.13 $88.32 $73.19 <br />Number of units : 3 1 1 1 1 1 <br />Group subtotals : Work : $726.76 Support : $512.26 Maintenance : $161.52 <br />Total work team cosUhour : $1,400.54 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,000 LCY factor : NA volume : 2,000 LCY <br />Source of quantity take-off :Permit Volume 1, Page 53; Map 8-1 <br />Source of estimated swell factor : NA <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br /> <br />........................................................ <br />HOURLY PRODUCTION' :::::......................................................... <br />......................................................... <br />......................................................... <br />.................................... <br />................................... <br />......................... <br />......................... <br />Truck Capacity <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 1,600 pounds/LCY Struck volume : 33.80 LCY <br />Descr.: Coal -Bituminous, Raw Heaped volume : 45.90 LCY <br />Rated payload : 108,060 pounds Average volume : 39.85 LCY <br />Payload capacity : 67.54 LCY Adjusted volume": 45.90 LCY <br />Final truck volume based on number of loader passes : 43.88 LCY <br />'truck volume adjusted to not exce ed rated payload or heaped volume <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (ft.) : 7,100 <br />Rated capacity (nom. heaped) : 11.250 LCY Truck Loader Source <br />Descr.: Loose material -uniform aggr. to 1/8" (95-100%) Altitude adj.: 1.000 1.000 (Cat HB) <br />Bucket fi-I factor : 0.975 Job efficiency : 0.830 0.830 (1 shiff/day) <br />Adjusted bucket capacity : 10.969 LCY Net correction : 0.830 0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.