My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-02_PERMIT FILE - C1981038
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2008-04-02_PERMIT FILE - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:26:44 PM
Creation date
6/4/2008 10:49:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
4/2/2008
Section_Exhibit Name
Reclamation Cost Estimate RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Caaacity <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis <br />Material weight : 2,900 pounds/LCY <br />Material description <br />Decomposed rock - 50% Rock, 50% Earth <br />Rated payload : 75,000 pounds <br />Payload capacity : 25.86 LCY <br />Cvcle Time <br />Scraper loading time " : 1.00 <br />Maneuver and spread time : 0.60 <br />"load time per scraper pair on push-pull models <br />Struck volume : 24.00 LCY <br />Heaped volume : 34.00 LCY <br />Average volume : 29.00 LCY <br />Adjusted capacity : 25.86 LCY **" <br />hourly production reflects volume per scraper pair on push-pull models <br /> Job Condition Corrections : Site altitude (ft.) : 7,100 <br /> Scraper Push dozer Source <br />minutes Altitude adj.: 1.000 NA (Cat HB) <br />minutes Job efficiency : 0.830 NA (Cat HB) <br /> Net correction : 0.830 NA <br />Travel time <br />Road condition description :Fi-m, smooth, rolling, dirf/It. surtaced, watered, maintained <br />Haul Route <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)*" <br />1 200 10.00 3.00 13.00 710 0.30 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route <br />Haul time : 0.30 minutes <br />minutes <br />"travel time for each segment is adjusted for acceleration/deceleration. Return time : 0.10 <br />table velocities are max. attainable per total resistance shown, not average <br />
The URL can be used to link to this page
Your browser does not support the video tag.