Laserfiche WebLink
CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Task # : 008 State :Colorado PermiUjob # : C-1981-038 <br />Date : 11/20/2007 County :Delta Abbreviation :none <br />User : JRS Site :Bowie No. 1 Mine Filename : C038-008 <br />Permit or other job action :Partial Phase 1 Bond Release SL-03 <br />Task description :Haul Fill from C&S Zone 1-A to Portal Zone 4-C <br />HOURLY EQUIPMENT COST <br />uipment Description <br />Shift basis : 1 perday <br />Truck/loader team -Truck <br />-Loader: <br />Support equipment -Load area <br />-Dump area <br />773D (2002) <br />T 990 Series 11(2005) <br />t D10R - 10SU (2005) <br />t D10R - 10SU (2005) <br />Road maintenance -Motor grader :CAT 14H <br />-Water truck :Water Tanker, 5, 000 Gal. <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer grader misctruk <br />Utilization-machine : 97 100 100 100 50 50 <br />-Ripper attachment : NA NA 0 0 0 NA <br />Ownership cost/hour : $52.49 $105.80 $84.86 $84.86 $39.60 $21.89 <br />Operating cosUhour : $85.89 $116.75 $138.49 $138.49 $24.26 $17.36 <br />Ripper op. cost hour : NA NA $0.00 $0.00 $0.00 $0.00 <br />Operator cost/hour : $21.72 $32.96 $32.78 $32.78 $24.47 $33.94 <br />Unit subtotals : $160.09 $255.52 $256.13 $256.13 $88.32 $73.19 <br />Number of units : 5 1 1 1 1 1 <br />Group subtotals : Work : $1,055.99 Support : $512.26 Maintenance : $161.52 <br />Total work team cost/hour : $1,729.76 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 100,560 CCY factor : 1.165 volume : 117,152 LCY <br />Material weight : 2,900 pounds/LCY Struck volume : 33.80 LCY <br />Descr.: Decomposed rock - 50% Rock, 50% Earth Heaped volume : 45.90 LCY <br />Rated payload : 108,060 pounds Average volume : 39.85 LCY <br />Payload capacity : 37.26 LCY Adjusted volume': 37.26 LCY <br /> Final truck volume based on number of loader passes : 37.13 LCY <br /> 'truck volume adjusted to not exce ed rated payload or heaped volume <br />Loadin4 Tool Capacity : Job Condition Corrections : Site altitude (ft.) : 7,100 <br />Rated capacity (nom. heaped) : 11.250 LCY Truck Loader Source <br />Descr.: Other - rock/dirt mixtures (100-120%) Altitude adj.: 1.000 1.000 (Cat HB) <br />Bucket fill factor : 1.100 Job efficiency : 0.830 0.830 (1 shifdday) <br />Adjusted bucket capacity : 12.375 LCY Net correction : 0.830 0.830 <br />