My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-02_INSPECTION - M1977572
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1977572
>
2008-06-02_INSPECTION - M1977572
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:32:17 PM
Creation date
6/4/2008 9:42:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977572
IBM Index Class Name
INSPECTION
Doc Date
6/2/2008
Doc Name
Corrective Action- Resolution Proof
From
Valco, Inc.
To
DRMS
Inspection Date
10/25/2007
Email Name
DEG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r. <br />(Page 3) <br />MINE ID # OR PROSPECTING ID # M-1977-572 <br />INSPECTION DATE 10/25/2007 <br />INSPECTOR'S INITIALS DEZ <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1 Tamarisk was observed on the active mine area 4 1 2008 <br />PB or PV: PB <br />- = -CORRECTIVE ACTION:" -TOPIC(S):- RV <br />The Operator must create a weed control and management plan per Rule 3 1 10(6) on or before <br />April 1. 2008. This plan should be developed in consultation with the county extension agency, or <br />weed control district office, and should include specific control measures to be applied a schedule <br />of when the control measures will be applied and a post-spray monitoring plan <br />2. Improper storage and containment of fuels and other hazardous materials was found on site 4 / 1 / 2008 <br />PB or PV: PB <br />CORRECTIVE ACTION: TOPIC(S): AT <br />All storage tanks, petroleum and any hazardous materials on site for any period of time shall have <br />secondary containment. Please supply photo documentation that the fuel tank and any additional <br />containers are stored in a proper secondary containment structure on or before April 1 2008 This <br />secondary containment structure shall include a berm that contains all contents of the tank and <br />various containers (when full) plus 10% of the containers' capacity, and an impermeable liner. Or <br />provide photo documentation that all containers have been removed from the site on or before April 1 <br />2008. <br />PB or PV: _ <br />CORRECTIVE ACTION: TOPIC(S):
The URL can be used to link to this page
Your browser does not support the video tag.