Laserfiche WebLink
ECLAIMED 2-ACRE TEST <br />EACH AND OFFICE SITE <br />(SEE INSERT) <br />1 <br />I <br />I I <br />EASTERLY PORTION. P <br />I I (WITHIN 1988 PIPEL <br />I ACRE$ <br />I <br />I RITO <br />-- - - - ?PECO ROAD - - -^ - , - <br />I <br />I y <br />i <br />5 ACRES <br />IRRIGATION <br />i <br />I ? <br />( <br />EXISTING RUJTBOIIINDARY <br />ORRIDOR ti <br />VENT) 4 3 ? y \ <br />,URE C-3) <br />r <br />SAN PEDRO TRACTS 1i <br />ACRES i (SEE FIGURE C12) <br />WESTERLY PORTION, PIPELINE <br />CORRIDOR (NEWMONT REALTY <br />LANDS) 4 1 ACRES i (SEE <br />FIGURE C-3) <br />M-tZ <br />T PIT <br />_ EXISTING BMRI <br />/'I?ERMIT BOUNDARY <br />n <br />??A\T <br />t <br />/ <br />WESTERLY PORTION, EL PLOMO TRACT <br />401 ACRES i (SEE FIGURE 02) <br />SOUTH PIVOT f <br />Sample Locations on May 7, 2008 <br />/// ?RITOSE San Luis Project, M-1988-112 <br />/ 9x <br />RS-1 surface water, upstream of West Pitt <br />SALAZAR DITCH <br />RS-2 surface water, downstream of West Pit t <br />^} Y ?ALAZ RESERVOIR <br />BF-4 ground water, West Pit dewatering well PE. <br />;'LM-2 M-12 groundwater, down-gradient of tailings pond <br />SLM-1 ground water, down-gradient of mine site <br />and up-gradient of proposed irrigation area <br />FIGURE C- <br />SLM-2 ground water, down-gradient of proposed N SITE PLAN <br />irrigation site and up-gradient of Town of San Luis <br />X11, &.0 yon, ,1. 100 <br />l1 Is Town of San Luis supply well, 11606-F SIALE IN FEET _v4ft - <br />26W TELESTO <br />.." -r---• ,.