My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-23_HYDROLOGY - M1998104
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1998104
>
2008-05-23_HYDROLOGY - M1998104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:31:56 PM
Creation date
6/4/2008 9:37:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998104
IBM Index Class Name
HYDROLOGY
Doc Date
5/23/2008
Doc Name
Substitute Water Supply Plan
From
DWR/OSE
To
E & C Services
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Monthly Accounting Form <br />ACA Products - Avery Construction <br />May 2008 <br />Pine Ridge Pit, Templeton Ditch Diversion, Half Moon Creek <br />Date Water Consom tion Water D ivenioos/Re hcements -- <br /> <br /> <br /> <br />1 <br />Wash Pond <br />Initial Refill <br />acre -feet <br />2 Monthly <br />Distribution of <br />Evaporation <br />inches <br />3 <br />Evaporation at <br />Pond Surface <br />(acre-fed) <br />4) <br />Aggregate <br />Production <br />(tons) Aggregate <br />water (2% of <br />product in acre <br />feet <br />6 <br />Total Water <br />Consumed <br />aao-fcet <br />Time of <br />Reading/ <br />Setting Gate <br />8 <br />Physical Flow <br />Available at <br />H ate cfs <br />9 <br /> <br /> <br />omment <br />10 <br /> <br />Flume <br />Reading <br />01 <br /> <br /> <br />low cfs <br />12 Out of Priority <br />Water <br />Diverted <br />(acre-feet <br />13 <br />I <br /> <br />- <br />14) <br /> <br />Replacement Sourct <br />Releases acre-feet <br />15) <br /> i <br />1-Ma 4 2.79 0.465' .0.00. 4.47.' 0.00 ( -___-- <br />kM- a <br />3-Ma -: ' `. : - 0.00 <br /> <br />00 <br /> <br />__ <br /> <br /> <br />-_-__--- <br />- <br />MMe - 0 <br />1 j <br />5 -MM <br /> <br /> <br />6-Ma <br /> <br /> <br /> <br />? <br /> <br /> <br />- <br />0.00 <br /> <br />0.00 - <br /> <br />- <br /> <br />---- <br />r--- - --- <br />7-Ma 0.00 <br />8-May <br />0.00 <br />9 Ma 0.00 <br /> <br />11-Ma <br /> <br />12-Ma <br /> <br />... <br /> <br />- <br /> <br />,., . :..... <br /> <br />..... 0.00 <br />---} <br />_0.00 I <br />- <br />--- ----- <br />---- <br />--- <br />13-Ma _ 0.00 <br />14-Ma 0.00 <br />15-Ma 0.00 <br />- i _ <br />- <br />16-Ma 0.00 -- +-------- <br />17-Ma .. 0.00 <br />1>MMa 0.00 <br />19-Ma - 0.00 <br />20-Ma 0.00 _ <br />21-May % 0.00 <br />Z2-Ma 0.00 <br />23-Ma 0.00 <br />24-May <br />0.00 <br />- <br /> <br />- <br /> <br />25-Ma <br />0.00 ---- <br />26-Ma 0.00 _ <br />27-ltfa 0.00 - <br />28 Ma ; . „+ 0.00 <br />Z9 Ma 0.00 --- <br />30-Ma 0.00 <br />31-Ma 0.00 <br />oral 4 2.79 0.465 0 0.00 4.47 0.00 - <br />Column Notes: <br />( I) Date <br />(2) Estimated to be 4 ac-ft <br />(3) Net Monthly Evaporation, (UAWCD Plan of Augmentation (94CWS, paragraph S.c.S) <br />(4) Monthly evaporation based on a surface area of 2 acres. (Col. 3 s 2) <br />(5) Amount of aggregate produced (tons) <br />(6) Water shipped with aggregate (2% by weight) and converted to acre-feet. <br />(7) Total water consumed (Col. (2) + CoL(4) + CoL(6)) - acre-feet <br />(8) Time of flume reading or gate adjustment <br />(9) Physical flow available on Half Moon Creek at the head gate <br />(10) Comment from field personnel <br />(11) Flume reading <br />(12) Flow from flume tabK cis <br />(13) Water diverted out of priority; based on flume readings over recorded time intervals <br />(14) Transportation loss charges, assigned by the State, If applicable <br />(15) Replacement source releases <br />Pine Ridge Monthly Water Usage Report 2008, Usage Report 2/222008
The URL can be used to link to this page
Your browser does not support the video tag.