Laserfiche WebLink
TABLE 1 — HAUL ROADS, BASIC PARAMETERS <br /> ROAD STARTING POINT END POINT LENGTH(FT) AVERAGE G=ADE (8) <br /> A WASH PLANT JUNCTION OF B 6,400 8.1 <br /> AND E ROADS <br /> B JUNCTION OF E AND JUNCTION OF C 3,700 .0.0 <br /> A ROADS AND D ROADS <br /> JUNCTION OF B AND 3 4 MINE BENCH 15,800 2.0 <br /> D ROADS <br /> D JUNCTION OF C AND 1 1 MINE BENCH 12,000 d.7 <br /> 3 ROADS <br /> D—A D ROAD, BELOW # 2 MINE BENCH 600 9.2 <br /> i 1 MINE BENCH <br /> E JUNCTION OF A AND JUNCTION OF 6,250 8.5 <br /> B ROADS F AND G ROADS <br /> F JUNCTION OF E AND i 3 MINE BENCH 13,400 8.5 <br /> G ROADS <br /> G JUNCTION OF E AND 1 5 MINE BENCH 19.700 2.7 <br /> f ROADS <br /> TOTAL LENGTH 77,850 FT <br /> (14.74 MILES) <br /> • <br /> 1? <br /> GEC4fwW CONSUMNG,INC. <br />