My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-12-01_PERMIT FILE - C1981017 (287)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
1987-12-01_PERMIT FILE - C1981017 (287)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 7:09:34 AM
Creation date
6/3/2008 10:58:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
12/1/1987
Doc Name
Estimated Reclamation Cost Calculations
Section_Exhibit Name
Chapter V Appendix V-D-1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EARTHWORK ESTIMATING - TRUCK/LOADER TEAMS <br /> i 3 <br /> TASK* DESCRIPTION: .' , ' <br /> .... <br /> HOURLY EQUIPMENT COST: <br /> Truck make and model p c <br /> Loader make and model <br /> adjusted Operator Cost Per Hour <br /> hours days base base shift total <br /> shift per per rental operating atee overtime hr adjustment premium <br /> cost/hr <br /> no. day week rate/hr. cost/hr / <br /> o <br /> . 80 <br /> i 2 <br /> 's 3 tota truckcost r. _ -, 9 7 0 <br /> total loader cost/hr. <br /> L_?2 �/hr. divided by �_ shifts/day = E S'�os average truck cost/hr. <br /> /hr. divided by �_ shifts/day = $ iy� average loader cost/hr. <br /> MATERIAL QUANTITIES: <br /> BCY x swell .factor��= 806 LCY <br /> -Bank volume = <br /> Verification method(s) used <br /> HOURLY PRODUCTION: ftt <br /> ft. , return distance = ft. , altitude = <br /> res. . <br /> Haul distance =tea8 c) grade, +or- _ 9 % <br /> Total resistance au % rolling res. p us % <br /> Total resistance (return)— � rolling res. plus grade res. (nhill) —S <br /> Note: for grade resistance, (+) = unfavorable, favorable (downhill ) <br /> Truck capacity LCY (nominal heaped) bucket fill factor from <br /> Loader capacity = LCY (nominal heaped) x /o 0 <br /> fill factor a Justment table in Section VII = LAY/bucket load (adj. cap'y) <br /> No. of loader passes required to fill truck = (round to nearest whole no.) <br /> Adjust truck capacity = 3a LCY <br /> min. <br /> Loader cycle time: basic cycle ( load, maneuver and dump) _ <br /> 1st pass = 0.1 min (bulk of lst pass completed during truck exchange time) <br /> 2nd ---------- . ( min <br /> • <br /> 3rd ---------- .6 min Loader cycle corrections: <br /> 4th ---------- •6 min <br /> Sth ---------- min <br /> 6th ---------- min <br /> 9 min total load time <br /> Truck cycle time: Exchange time ---------- • 7 min. <br /> Load ------------------- i 9 <br /> Haul ------------------- <br /> Maneuver at dump ------- 7 <br /> Dump ------------------- 2. <br /> ! Return <br /> / <br /> 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.