My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-12-01_PERMIT FILE - C1981017 (286)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
1987-12-01_PERMIT FILE - C1981017 (286)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 7:10:48 AM
Creation date
6/3/2008 10:52:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
12/1/1987
Section_Exhibit Name
Chapter V Table of Contents
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter V <br /> The operator will carry out a program at the portal bench areas to clean up and dispose <br /> of,non-coal waste materials, demolish and remove or repair structures damaged by the; <br /> elements, and consolidate equipment and materials for which future use is anticipated. , <br /> Work was done at Mines #1 and #2 in 1991. The schedule for completion of work at <br /> the other portal benches is as follows: <br /> #4 Mine 1993 <br /> #5 Mine 1994 <br /> #3 Mine 1995 <br /> Portal benches are required for use in the mining operation, as follows: <br /> Mines#1 and #2 Portal Benches <br /> Ventilation fans and escapeways, roof support system. <br /> Mine #3 <br /> Operations planning anticipates extraction of coal from#3 mine, which is not accessed <br /> by the rock tunnel. <br /> • Mine#4 <br /> Operations planning anticipates a program for degassification of the coal ahead of <br /> mining. The #4 portal bench is required as a staging area, and the road from #4 Mine; <br /> across Huntsman Ridge is required for access to the land above the underground <br /> workings. <br /> Mine #5 <br /> May be required for access to an unmined block of coal in the M-bed seam. <br /> e. Solid Waste Disposal Area. <br /> Non-coal waste is disposed in the approved trash disposal area, which is situated near <br /> the Rock Tunnel yard, adjoining the permanent tunnel fill. <br /> The trash disposal area situated at Mine#1 is no longer in use. The landfill has beer: <br /> covered with two feet of non-combustible rock material from the tunnel fill area. <br /> Additional soil material obtained during maintenance of the roads from clean-out of <br /> ditches and catchment basins, excavation of culverts and the like, will be placed on the <br /> Mine #1 trash pile and used as a growth medium. The area will be seeded and <br /> mulched with a seed mix approved by the Division. <br /> • The final configuration of the pile is indicated below. The berm around the outside of <br /> the bench will be retained. <br /> 20 <br /> Revised 7/92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.