Laserfiche WebLink
Chapter V <br /> (3) Topsoil Salvage. <br /> Sutey refuse area <br /> Adit/Rock Tunnel area <br /> Tunnel to Prep. Plant Area <br /> Sediment Ponds <br /> (4) Topsoil Replacement. <br /> Old refuse pile <br /> Methane gas pipeline <br /> Sediment pond embankments <br /> Conveyor route to Sutey site <br /> Access road to Sutey site <br /> Overland conveyor route <br /> (5) Planting & Revegetation. <br /> Road cuts <br /> Old refuse pile <br /> Topsoil piles <br /> Sediment pond embankments <br /> Methane pipeline route <br /> Overland conveyor route <br /> Conveyor route to Sutey site <br /> b. INTERIM RECLAMATION_ <br /> (1988-End of Mining). <br /> The major steps are: <br /> - General clean-up <br /> - Grading <br /> - Topsoil Replacement <br /> - Sediment Pond Construction <br /> - Topsoil Salvage <br /> - Revegetation <br /> - Maintenance <br /> (1) General clean-up. <br /> Portal Benches <br /> No. 1 <br /> No. 2 <br /> No. 3 <br /> No. 4 <br /> No. 5 <br /> s <br />