Laserfiche WebLink
- 17 - <br /> • Table 1 summarizes monitoring data for the 22 points dis- <br /> cussed above. <br /> TABLE 1 <br /> SUBSIDENCE MONITORING POINTS SUMMARY <br /> POINT 1981- 1982- 1983- 7/3/84- 9/17-20/84- TOTAL <br /> NO. 1982 1983 7/3/84 9/17-20/84 8/9/85 SUBSIDENCE* <br /> TP-1 ns ns ns -0.97** -0.97 -1.94 <br /> TP-2 ns ns ns nsd** . nsd nsd <br /> TP-3 ns ns ns nsd** nsd nsd <br /> TP-4 ns ns ns -0.13** -0.06 -0.19 <br /> TP-5 0.00 -0.38 ns -0.66**/nsd -0.25 -0.91 <br /> TP-6 - - - i -0.89 -0.89 <br /> MC-1 +0.07 -0.06 ns ns ns +0.01 <br /> MC-2 -0. 12 -0.91 -0.01 -0.61 -0.29 -2.03 <br /> MC-3 -0.02 -0.50 ns -0.18 -0.20 -0.90(d) <br /> MC-4 -0.09 -0.09 -1.38 -0.54 nsd -2.10(d) <br /> MC-5 -0.97 -0.30 -0.46 nsd nsd -1.73 <br /> MC-6 +0.03 -0.24 -0.27 nsd nsd -0.48 <br /> MC-7 +0.02 -0.01 ns ns ns +0.01 <br /> MC-8 ns +0.04 nsd ns nsd nsd <br /> MC-9 ns +0.02 ns ns nsd nsd <br /> MC-10 - - - i -0.32 -0.32 <br /> MC-11 - - - i -0.47 -0.47 <br /> • MC-12 - - - i -0.10 -0.10 <br /> MC-13 - - - i -0.17 -0.17 <br /> MC-14 - - - i nsd nsd <br /> MC-15 - - - i nsd nsd <br /> MC-16 - - - i nsd nsd <br /> *To 8/9/85; net total where both positive and negative movements reported. <br /> **Since 1981 baseline survey. <br /> ns: not surveyed. <br /> nsd: no subsidence detected. <br /> is installed September 1984. <br /> (d) : differs from MSE report, 9/8/85 (MC-3, -0.89; MC-4, -2.12) . <br /> Table 2 summarizes total movement recorded at each control <br /> and monitoring point from Table 1, an estimate of coal removed <br /> in the area affecting that point, and the subsidence ratio cal- <br /> culated by dividing the total movement by the coal thickness <br /> removed. It should be emphasized that for the most part total <br /> coal removed is based on isopach maps and recollection; in most <br /> cases there is no exact record of average coal thicknesses <br /> removed at or near point locations. <br /> • <br />