Laserfiche WebLink
16 - <br /> Subsidence Ratio:• 0. 02 Location Relative to Mine Workings : approximate centerline, <br /> lw 102 No. 1 mine, 740 ft ahead of face on 8/9/85 . <br /> Discussion: in longwall 102 subsidence zone. Projected <br /> maximum subsidence using ratio of 0. 30 : 3 .00 ft. See <br /> Figure 18 . <br /> Point No. : MC-14 <br /> Type : monitoring <br /> Installed: 9/17-20/84 Surveyed: 8/85 <br /> Location (mine coordinate system) : 12516 .46N, 1961 . 14E <br /> Original Elevation (ft) : 11,589 .56 <br /> Total Movement Since Installation (ft) : none detected <br /> Estimated Coal Removed Within Subsidence Zone (ft) : none <br /> Subsidence Ratio: -- <br /> Location Relative to Mine Workings: approximate centerline, <br /> lw 102 No. 1 mine, 918 ft ahead of face on 8/9/85 . <br /> Discussion: ahead of longwall 102 No. 1 mine subsidence zone <br /> on date surveyed. See Figure 19. <br /> Point No. : MC-15 <br /> Type : monitoring <br /> Installed: 9/17-20/84 Surveyed: 8/85 <br /> Location (mine coordinate system) : 12677 .87N, 1846 .19E <br /> Original Elevation (ft) : 11,576 .22 <br /> Total Movement Since Installation (ft) : none detected <br /> • Estimated Coal Removed Within Subsidence Zone (ft) : none <br /> Subsidence Ratio:-- <br /> Location Relative to .Mine Workings : approximate centerline , <br /> lw 102 No. 1 mine, 1 ,113 ft ahead of face on 8/9/85 . <br /> Discussion: ahead of longwall 102 No. 1 mine subsidence zone <br /> on date of survey. See Figure 19 . <br /> Point No. : MC-16 <br /> Type : monitoring <br /> Installed : 9/17-20/84 Surveyed: 8/85 <br /> Location (mine coordinate system) : 12840 .20N, 1729 . 95E <br /> Original Elevation (ft) : 11 ,562 . 01 <br /> Total Movement Since Installation (ft) : none detected <br /> Estimated Coal Removed Within Subsidence Zone (ft) : none <br /> Subsidence Ratio: -- <br /> Location Relative to Mine Workings: approximate centerline, <br /> lw 102 No. 1 mine, 1 ,313 ft ahead of face on 8/9/85 . <br /> See Figure 19. <br /> NOTES : Total movement is net total where both positive <br /> and negative movements have been recorded. Projected max- <br /> imum subsidence, where given, is theoretical maximum at a <br /> ratio of 0.30 , assuming critical or super-critical extrac- <br /> tion widths. <br />