My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-12-01_PERMIT FILE - C1981017 (282)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
1987-12-01_PERMIT FILE - C1981017 (282)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 7:13:15 AM
Creation date
6/2/2008 12:39:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
12/1/1987
Doc Name
Technical Proposal Subsidence Intensive Monitoring Net
Section_Exhibit Name
Chapter IV Appendix IV-F-2
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All field construction and surveying will have to be completed in the summer <br /> months after the snow cover has melted and before the first major snow storm <br /> in the fall . <br /> Task II - Instrumentation Plan <br /> Mine Subsidence Engineering Company proposes to measure surface deforma- <br /> tion over panels 301 and 302 at the Mid-Continent Resources , Inc. , No. 3 Mine <br /> (Figure 2). The surface response to mining shall be .determined through the <br /> measurement of both vertical and horizontal displacements of the ground <br /> surface. Subsidence response would be obtained for the second or lower lift <br /> on panel 301 (301L) and for both lifts of panel 302 (302 and 302L) . The time <br /> required to completely mine all three lifts will be approximately 61 months. <br /> The time required to complete the proposed subsidence investigation and final <br /> • report will be approximately 73 months assuming the contract com,:ences an <br /> October 1, 1980. <br /> The difference between mining time and project duration is caused by the <br /> ' .. <br /> ;eatner-imposed delay in completing the final , after mining survey. '•:ni le <br /> mining is to be completed in October 1985, the final surrey can not :;e per- <br /> formed until the snow cover has melted off in July 1986. <br /> A variety of techniques were explored as possible methods to monitor <br /> subsidence in the study area. These included areal and terrestrial Photo- <br /> grar^mctry, remote position monitoring instruments and conventional surveying- <br /> Preliminary engineering analysis indicated that conventional surveying and <br /> areal photogramir,etric methods would be the most cost effective monitoring <br /> . techniques. <br /> • An on-the-ground site reconnaissance was conducted by Mine Subsidence <br /> Engineering personnel on July 20 , 1980 to explore the applicability of the <br />