My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-12-01_PERMIT FILE - C1981017 (280)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
1987-12-01_PERMIT FILE - C1981017 (280)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 6:42:20 AM
Creation date
6/2/2008 12:34:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
12/1/1987
Doc Name
Process Flow Description
Section_Exhibit Name
Chapter IV Attachment B
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT B <br /> Process Flow Description <br /> [See Process Flow Diagram - Attachment A] <br /> Note: Numbers Correspond to Description <br /> Present System <br /> 1. "White pipe" conveys flow from underground workings to the <br /> surface through the rock tunnel . <br /> 2. Mine water is flocculated on leaving the tunnel. <br /> 3 . Mine water flows to the three-pond series of Outfall 016 for <br /> settling prior to discharge to Dutch Creek. <br /> Underground Sizing Screen <br /> 4. Underground grit screen removes coarse solids. <br /> Water Treatment Plant <br /> 5. Mine water is routed (at valve box) through pipeline to <br /> recycle sump/hydrocyclone of mine water treatment plant*. <br /> 6. Underflow from recycle sump/hydroclone, containing middling <br /> solids, goes into the coal preparation plant cycle. <br /> (Alternative: underfloor goes to 001 ponds. ) <br /> Note: Calculations re. 001 ponds. Attachment E. <br /> 7 . Overflow from the recycle sump/hydroclone, containing very <br /> fine (-200 mesh) solids proceeds to flocculation, then to <br /> "finishing" (i .e. settling of fine solids) in sediment pond at <br /> outfall 020 (Alternative: 001 pond(s) used for "finishing") <br /> Note: calculations re. 020 pond. Attachment D. <br /> Calculations re. 00l ponds. Attachment E. <br />
The URL can be used to link to this page
Your browser does not support the video tag.