Laserfiche WebLink
Chapter IV <br /> TABLE IV-C-1 <br /> SEDIMENT PONDS <br /> COAL BASIN <br /> POND NAME CDESINPDES # NO. SIZE* <br /> Preparation Plant 001 4 3 . 89 <br /> Old Refuse (S) 006 1 0. 12 <br /> Bathhouse 009 2 4 . 64 <br /> Picnic 020 1 1 . 12 <br /> Slurry N/A* 1 1. 26 <br /> Warehouse 010 1 0. 59 <br /> Bus Garage 008 3 3 . 01 <br /> ( a.k.a. Redwood Tank) <br /> Tunnel 016 3 10. 54 <br /> Tunnel Pad 025 1 0 . 64 <br /> . Sutey 021 2 4 . 86 <br /> No. 1 Mine 018 2 2 . 48 <br /> No. 2 Mine 022 2 0. 6 <br /> No. 3 Mine (N) 014 1 0 .5 <br /> • No. 3 Mine (S) 015 2 0. 37 <br /> No. 3 Mine Bin Pad 023 1 0 . 29 <br /> No. 4 Mine 013 1 0. 39 <br /> No. 5 Mine 017 1 1.5 <br /> Total = 29 Ponds <br /> SEDIMENT PONDS NOT YET CONSTRUCTED <br /> (Permit Permission has been obtained for future construction) <br /> Tunnel Ponds 016 2 8. 28 <br /> Sutey N/A 1 1 . 66 <br /> No. 4 Mine N/A 4 0 . 11 <br /> Total = 7 Ponds <br /> CARBONDALE LOAD-OUT SITE <br /> SEDIMENT PONDS <br /> Loadout Pond 001 1 . 15 <br /> 19 Revised 6/91 <br />