Laserfiche WebLink
-4- <br />12. Primarv future (Post-mining) land use (check one): <br />Cropland(CR) _ Pasturcland(PL) <br />Rangeland(RL) _ Forestry(FR) <br />Residential(RS) _ Recreation(RC) <br />- Developed Water Resources(WR) <br />13. Primary present land use (check one): <br />Cropland(CR) _ Pastureland(PL) <br />YL- Rangeland(RL) _ Forestry(FR) <br />Residential(RS) _ Recreation(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife I labitat(WL) <br />Industrial/Commercial(IC) <br />Solid Waste Disposal(WD) <br />_ General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(I C) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): This area is mined using loaders and dozers to <br />move material from the embankment to the processing plant. <br />15. On Site Processing: )4- Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): Processing Plant is moved to site until approximately 40,000 <br />tons is stockpiled The stockpiles are removed as needed until it is time to crush again. <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: None <br />16, ]Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />