Laserfiche WebLink
MINING PLAN <br />EXHIBIT D <br />during the life of the mine. We therefore, elect to estimate the <br />mining timetable based on an average year and expect a specific <br />year to vary widely from the average. If there are changes in <br />the mining timetable we will discuss the reasons for the change <br />in the annual report that follows the change and modify it then. <br />ESTIMATED MINING TIMETABLE <br />ACRES ± <br />ESTIMATED <br />YEARS TOTAL <br />AREA TOTAL <br />MINED MINED <br />100% MINED <br />SLOPES <br />10-15 38.57 26.78 29.00 7.78 <br />12