Laserfiche WebLink
When considering this adjacent area it becomes apparent <br /> that these two watersheds will experience radically different <br /> impacts from the mining operation. The Coal Creek drainage <br /> will continue to be directly affected by the mining operations <br /> as the mine portals , surface facilities , coal processing <br /> plant, and roadways are all located within the drainage. <br /> Impact on the C1ear ,Fork and East Muddy Creek drainage will, <br /> in general, be. mirimal as all of the coal mining will be <br /> subsurface and at depth. No surface facilities are planned <br /> for this area; and roadways will be constructed to provide <br /> access to drill hole locations only. <br /> This report is in two sections as follows : <br /> HYDROLOGIC REPORT, GROUND WATER SECTION <br /> HYDROLOGIC REPORT, SURFACE WATER SECTION <br /> ii <br />