Laserfiche WebLink
adverse impacts . (See Section C , Chapter IV) As suggested by <br /> the USFS recommendations , Mid-Continent has <br /> - Installed sedimentation ponds to control <br /> sediment production from the mine platforms <br /> - Reduced the construction of outside road <br /> berms to minimize road material spoilage <br /> during snow removal procedures <br /> - Installed road ditches designed to convey <br /> runoff from the two year storm event <br /> - Installed culverts to convey the peak runoff <br /> from the 10 year/24 hour storm event <br /> - Installed impoundments to contain and <br /> control sediment from 10 year/ 24 hour peak <br /> • flow runoff event <br /> Installed rip rap where necessary to <br /> minimize erosion <br /> - Initiated a monitoring program to <br /> quantify the effect of implementing an erosion <br /> control plan <br /> d . Surface water rights <br /> Surface water rights within the permit and <br /> adjacent areas are indicated on Table III-E-9 & 10 . <br /> The only industrial water right within Coal <br /> Basin has been obtained by Mid-Continent for the preparation <br /> plant while the remaining have been filed for irrigation or <br /> • stock watering purposes . <br /> 42 <br /> if _ - <br />