Laserfiche WebLink
III-E-6. 1 <br /> • SURFACE WATER MONITORING PLAN <br /> Effective July 1 , 1980 <br /> 1. Rate the Dutch Creek Flume #5 (Install staff gage) . <br /> 2 . Rate the 48" CMP at Bear Creek above Coal Creek #3. <br /> 3 . Maintain stream gaging station and recorder at Coal <br /> Creek below Bear Creek #20 <br /> Monitor each station weekly starting April lst to <br /> October lst thence monthly thru the winter or as needed per <br /> unusual flow event. Report monthly minimum, maximum and mean . <br /> daily flows . <br /> Flow measurements will be taken when water quality <br /> samples are taken. <br /> • <br /> (Stipulation 9) <br /> 37. 1 (Vol. 5 Sec. III-E) . <br />