Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br /> <br />-Flatbed Truck, 4x2, 15K GVW $49.28 1 $49.28 $49.28 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $49.28 $49.28 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Transportation Cycle Time : Non- <br />Nearest major city or town within project area region : Craig <br />Total one-way travel distance : 35.0 miles <br /> Roadable <br />Equipment Roadable <br />Equipment <br />Haul time (hours) = 0.88 0.88 <br />Return time (hours) = 0.88 0.88 <br />Loading time (hours) = 0.50 NA <br />Unloading time (hours) = 0.50 NA <br />Subtotals = 2.75 1.75 <br />Average travel speed <br />Total non-roadable mob/demob cost * <br />* two round trips with haul rig <br />Total roadable mob/demob cost'`' <br />** one round trip, no haul rig <br />40.0 mph <br />$581.43 <br />$86.23 <br />JOB TIME AND COST Total job time : 5.50 hours <br />Total job cost : $668