Laserfiche WebLink
Replacement of topsoil will be accomplished by utilizing a <br /> D-8 dozer for one-half of the work and a 637-D scraper and <br /> 966-D loader for the other half. <br /> Total topsoil cubic yardage <br /> 7420 divided by 2 =. 3,710 cu. yds. <br /> D-8 dozer 3,710 divided by 350 CYH = 11 Hrs . <br /> 11 x $118 = $1,2.96 <br /> 637-D Scraper - 3710 divided by 220 = 17 Hrs. <br /> 17 x $211 = $3 ,587 <br /> Loader 17 x $68 = $1 , 156 <br /> Total for Topsoil Replacement '$6 ,039 <br /> Revegetation of 4. 6 acres at <br /> $1,375 per acre = $6 , 325 <br /> • Total Reclamation Cost = $16 ,100 <br /> 22 <br />