Laserfiche WebLink
r <br /> • <br /> 2.0 T 0 PSOIL <br /> 2.1 GENERAL <br /> 2.1.1' TOPSOIL FROM THE POND AREA HAS BEEN STRIED ANDNOT ST CKPILED , <br /> STOCKPILED TOPSOIL AND OTHER MATERIALS HALL <br /> MOVD <br /> UNTIL REQUIRE5 FOR REDISTRIBUTION ON A REGRADED AREA. <br /> 2,2 REDISTRIBUTION <br /> 2,2, 1 AFTER FINAL GRADING AND BEFORE THE REPLACEMENTEOFBTOMECHANPSOIL AND <br /> OTHER MATERIALS, REGRADED LAND <br /> ICAL <br /> MEANS TO A SUFFICIENT DEPTROV�DELFORNROOTSPENETRATIONS' RE- <br /> LIEVE COMPACTION, AND TO P <br /> 2,2,2 TOPSOIL AND OTHER MATERIALS SHALL BE REDISTRIBUTED IN A MANNER <br /> THAT : STABLE THICKNESS <br /> (A) ACHIEVES AN APPROXIMATE UNIFORM, <br /> CONSISTENT WITH POSTMININS <br /> SURFACE WATER DRAINAGE SYSTEM NANDSES REQUIREMENTS,OFHRE- <br /> VEGETATION; <br /> (B) PREVENTS EXCESS COMPACTION AND CONTAMINATION OF TOPSOIL: <br /> (C) MINIMIZES DETERIORATION OF THE OF THE BIOLOII AL.$ CHEMICAL, <br /> AND PHYSICAL PROPERTIES <br /> _ (D) PROTECTS THE TOPSTIDNFAND BEFOREROM WIND NANDAAFTERRITIIS <br /> DURING REDISTRIBU <br /> SEEDED AND PLANTED <br /> 3.0 INSPECTIONS <br /> 3.1 SEDIMENTATION PONDS <br /> 3.1.1 THE SEDIMENTATION PONDS SHALLBE INSPECTED DURING <br /> CONSTRUCTION <br /> AND CERTIFIED AFTER CONSTRUCTIONBY A QUALIFIED <br /> PROFESSIONAL ENGINEER, OR PERSON APPROVED BY CMLRD . <br /> 3.1.2 CERTIFICATION OF THE CONSTRUCTED <br /> DIVISON SHALL <br /> IMMEDIATELYAFOEDOW�NG <br /> COLORADO MINED LAND RECLAMATION <br /> CONSTRUCTION. <br /> l <br />