Laserfiche WebLink
2.0 TOPSOIL <br /> 2. 1 GENERAL <br /> 2.1. 1 TOPSOIL FROM THE POND AREA HAS BEEN STRIPPED AND STOCKPILED , <br /> STOCKPILED TOPSOIL AND OTHER MATERIALS SHALL NOT BE MOVED <br /> UNTIL REQUIRED FOR REDISTRIBUTION ON A REGRADED AREA . <br /> 2.2 REDISTRIBUTION <br /> 2.2. 1 AFTER FINAL GRADING AND BEFORE THE REPLACEMENT OF TOPSOIL AND <br /> OTHER MATERIALS, REGRADED LAND SHALL BE LOOSENED BY MECHANICAL <br /> MEANS TO A SUFFICIENT DEPTH TO ELEMINATE SLIP SURFACES, RE- <br /> LIEVE COMPACTION, AND TO PROVIDE FOR ROOT PENETRATION, <br /> 2.2 .2 TOPSOIL AND OTHER MATERIALS SHALL BE REDISTRIBUTED IN A MANNER <br /> THAT : <br /> (A) ACHIEVES AN APPROXIMATE UNIFORM, STABLE THICKNESS <br /> CONSISTENT WITH POSTMINING LAND USES, CONTOURS, THE <br /> SURFACE WATER DRAINAGE SYSTEM AND REQUIREMENTS OF RE- <br /> VEGETATION; <br /> (B) PREVENTS EXCESS COMPACTION AND CONTAMINATION OF TOPSOIL: <br /> (C) MINIMIZES DETERIORATION OF THE BIOLOGICAL, CHEMICAL, <br /> AND PHYSICAL PROPERTIES OF THE TOPSOIL; AND <br /> (D) PROTECTS THE TOPSOIL FROM WIND AND WATER EROSION <br /> DURING REDISTRIBUTION AND BEFORE AND AFTER IT IS <br /> SEEDED AND PLANTED - <br /> 3,0 INSPECTIONS <br /> 3. 1 SEDIMENTATION PONDS <br /> 3. 1. 1 THE SEDIMENTATION PONDS SHALL BE INSPECTED DURING CONSTRUCTION <br /> AND CERTIFIED AFTER CONSTRUCTION BY A QUALIFIED REGISTERED <br /> PROFESSIONAL ENGINEER, OR PERSON APPROVED BY CMLRD . <br /> 3.1.2 CERTIFICATION OF THE CONSTRUCTED POND SHALL BE FORWARDED TO <br /> COLORADO MINED LAND RECLAMATION DIVISON IMMEDIATELY FOLLOWING <br /> CONSTRUCTION . <br />