My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-12-01_PERMIT FILE - C1981017 (165)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
1987-12-01_PERMIT FILE - C1981017 (165)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:12:57 AM
Creation date
5/20/2008 11:39:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
12/1/1987
Doc Name
David E. Fleming Company Prepartation Plant Area Surface Drainage Plan
Section_Exhibit Name
Chapter II Attachment 3 to Appendix II-B-7
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONVERSION OF SLURRY POND TO SEDIMENTATION POND <br /> GENERAL NOTES <br /> 1 ) ELEVATIONS SHOWN ON FIGURES 2 AND 3 ARE FOR REFERENCE ONLY AND DO NOT IN- <br /> DICATE TRUE ELEVATION ABOVE MEAN SEA LEVEL. FINAL ELEVATIONS WILL BE DE- <br /> TERMINED FROM POND BOTTOM ELEVATION. <br /> 2) A TRASHRACK OF THE "KANSAS-TYPE" SHALL BE PROVIDED AT EACH SPILLWAY INLET. <br /> THE TRASHRACKS SHALL INCLUDE ANTI-VORTEX BAFFLES. <br /> 3) RIPRAP MATERIAL SHALL BE OF FREE-DRAINING, DURABLE ROCK, RANGING IN SIZE <br /> FROM 3 TO 15 INCHES IN DIAMETER, D50 = 9 INCHES. <br /> 4) A SEDIMENT LEVEL INDICATOR SHALL BE PROVIDED WHICH MARKS THE SEDIMENT <br /> CLEANOUT LEVEL IN THE POND. <br /> 5) SUFFICIENT RIPRAP SHALL BE PLACED ON POND SLOPES AT ALL POINTS WHERE <br /> CHANNELS ENTER THE PONDS AND THE NATURAL DRAINAGEWAY OF THE CREEK TO PRE- <br /> VENT UNDUE EROSION AT THESE POINTS. <br /> 6) DISCHARGE CHANNEL FROM POND TO CREEK SHALL BE CONSTRUCTED TO A CONFLUENCE <br /> WITH THE CREEK ALONG THE STRAIGHTEST REASONABLE PATH, TO BE DETERMINED AT <br /> THE TIME OF CONSTRUCTION. TWENTY-FOUR INCH DIAMETER CONDUITS SHALL BE <br /> USED AT ROAD CROSSINGS AS NEEDED. CHANNEL SHALL BE RIPRAPED ALONG ALL <br /> PORTIONS OF GRADIENT 4 PERCENT OR GREATER. <br /> 7) A CLEAN WATER DIVERSION DITCH SHALL BE CONSTRUCTED AT BASE OF UNDISTURBED <br /> SLOPE TO KEEP UNDISTURBED RUNOFF OUT OF'THE SEDIMENTATION POND SYSTEM. <br /> i . <br /> 48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.